UT FTNP DINO 10(3) 100(2) Green River Road and Quarry Access Road
Notice ID: 6982AF23B000028
****INVITATION FOR BID******
PROJECT DESCRIPTION: The UT FTNP DINO 10(3)100(2), Green River Road and Quarry Access Road, the project is in Dinosaur National Monument approximately 16.9 miles east of the Vernal Utah and 114.1 west of Craig Colorado. The project is proposing to rehabilitate (3R) roads and parking lots and pavement preservation on routes within Dinosaur National Monument UT and CO entrances. The project is broken up into a schedule with five options, described below.
SCOPE OF THE WORK: The project is proposing to rehabilitate (3R) approximately 1.82 miles of road along with pullouts for schedule A. Option X is a (3R) rehabilitation of 0.53 miles of road with two parking lots. For both Schedule A and Option X the roads parking lots, and pullouts are in need rehabilitation due to deterioration that is typical of aging pavements. The existing pavement section on both roadways are in poor condition with roadway cracking and aggregate surfacing. Options T, U,V, and W is proposing to pavement preservation 50.4 miles of roadways within Dinosaur National Monument CO and UT units for the Park. This pavement preservation work will include crack sealing, asphalt patching, micro sealing and chip sealing.
PRINCIPAL WORK ITEMS:
Schedule A:
- 20402-0000 Subexcavation, 4,900 CUYD
- 30202-2000 Roadway Aggregate, Method 2: 4,300 TON
- 30402-1000 Full Depth Reclamation, Method 2: 26,500 SQYD
- 40101-5600 Asphalt Concrete Pavement: 7,300 TON
- 60901-1000 Curb Concrete ,12-inch depth, 105 LNFT
- 61701-5100 Guardrail System MGS type 4, Class B Steel Posts 70 LNFT
Option T:
- 30402-5300 Full Depth Reclamation, Method 2, 6-Inch Depth
- 40101-5600 Asphalt Concrete Pavement: 1,810 SQYD
- 40702-0300 Chip Seal, Type 1C: 142,000 SQYD
- 40711-0000 Emulsified Asphalt: 270 TON
- 40901-2000 Micro Surfacing, Type 2: 39,010 SQYD
- 41801-2000 Asphalt Concrete Pavement Patch: 2500 SQYD
- 63402-0300 Pavement Markings, Type B, Solid 78 Mile
Option U:
- 40702-0300 Chip Seal, Type 1C: 217,000 SQYD
- 40711-0000 Emulsified Asphalt: 390 TON
- 40901-2000 Micro Surfacing, Type 2: 5,690 SQYD
- 41801-2000 Asphalt Concrete Pavement Patch, Type 2 185 SQYD
- 63402-0300 Pavement Markings, Type B, Solid 105.00 Mile
Option V:
- 40702-0300 Chip Seal, Type 1C: 178,000 SQYD
- 40711-0000 Emulsified Asphalt: 330 TON
- 40901-2000 Micro Surfacing, Type 2: 18,750 SQYD
- 41801-2000 Asphalt Concrete Pavement Patch: 810 SQYD
- 63402-0300 Pavement Markings, Type B, Solid 101 Mile
Option W:
- 40702-0300 Chip Seal, Type 1C: 151,000 SQYD
- 40711-0000 Emulsified Asphalt: 270 TON
- 40901-2000 Micro Surfacing, Type 2: 5,690 SQYD
- 41801-2000 Asphalt Concrete Pavement Patch, Type 2 185 SQYD
- 63402-0300 Pavement Markings, Type B, Solid 105.00 Mile
Option X:
- 20402-0000 Subexcavation, 4,700 CUYD
- 30202-2000 Roadway Aggregate, Method 2: 1,55 TON
- 30402-1000 Full Depth Reclamation, Method 2: 11,000 SQYD
- 40101-5600 Asphalt Concrete Pavement: 3,250 TON
- 60901-1000 Curb Concrete ,12-inch depth, 1,375 LNFT
- 61701-5100 Guardrail System MGS type 4, Class B Steel Posts 250 LNFT
ANTICIPATED SCHEDULE:
- Advertisement: November 2023
- Contract Award: January 2024
- Notice to Proceed: February 2024
- Construction Complete: September 2024
MISCELLANEOUS:
- The mainline road will be under 30-minute delays during construction.
- Weekend work on roads will not be allowed. Weekend work may be requested for periods of light visitation through April 1st, to May 1st, 2024 and September 1st to October 1st, 2024. Request the allowance of weekend operations at least 3 days in advance to schedule inspection services. Requests with less than 3 days of notice may be disallowed.
The estimated price range of the project work is between $10,000,000 and $20,000,000.
Office
6982AF CENTRAL FEDERAL LANDS DIVISI