This update is to correct the Site Visit date in the Desciption Section to 25 April 2024. Everything else remains unchanged.
Installation of Fire Alarm Panel and Transceiver System at B732, camp Carroll.
An organized site visit has been scheduled for: 25 April 2024 at 11:00 KST
Technical POC: Mr. Yi, Song Chol at 763-4832 and songchol.yi4.ln@army.mil