**AM-0003 is released on 12/17/2025. Follow the link to PIEE to see the atachments. RFI responses related to AM-0003 will be released in Projnet the following day on 12/18/2025. AM-0004 is planned for a release in the first 2-3 weeks of January of 2026. Another proposal due date extension is not anticipated, so please plan accordingly. **AM-0002 is released on 11/20/2025 JST. Follow the link to PIEE to see the atachments. RFI responses related to AM-0002 have been released in Projnet. **AM-0001 is released on 09/18/2025. Follow the link to PIEE to see the atachments. **This project is to construct a corrosion control facility for painting large-bodied aircraft. The facility consists of a single bay paint booth, single bay prep/wash hangar, and support spaces for painting and sanding operations.