Replace existing Active Vehicle Barriers (AVBs) system at Gate 2. New AVBs shall be relocate further awayfrom the Traffic Check House, B345, to give Security Forces personnel a minimum of 9 seconds responsetime. Install vehicle sensors to support AVBs operation such as safety loops. Rewire associated electricalpower and control circuit to B345. Repave the road with reinforced barrier curbs to prevent vehicles fromcircumventing the AVBs. Provide AVBs with storm water drains. Relocate traffic warning signs to the newAVBs location. Renovate Gate 2 Traffic Check House, B345, to accommodate the new AVBs. Expandelectrical panel and replace control switches to operate the new AVBs. Replace door lock assembly at theentrance to the electrical panel room. Renovate Gate 2 Overwatch, B348, to convert the Hydraulic Power Unit(HPU) room into a storage room with mechanical air ventilation system. Replace door locks for the HPU roomand guard booth. Sustainable principles, to include life cycle cost-effective practices, will be integrated intothe design, development, and construction of the project in accordance with UFC 1-200-02. The followingprojects are part of this requirement:LXEZ201073MA ADD/REPAIR VEHICLE BARRIERS, B7502LXEZ201073MB ADD/REPAIR VEHICLE BARRIERS, B345LXEZ201073MC ADD/REPAIR VEHICLE BARRIERS, B348