The work to be performed under this project consists of providing the labor, equipment and materials to increase the electrical load at Facility 1319 at Patrick Space Force Base. The electrical scope of work includes placing all building loads on generator backup for any future electrical outages. The existing ATS will be replaced with one sized to handle all building loads, demolishing the existing building supply circuit, installing a new building supply circuit to the new ATS, resupplying main distribution panel MDP1 from the new ATS, and resupplying switchboard EDP1 from MDP1. Two building electrical outages are required to perform this work.