This action will result in a follow-on firm-fixed-price task order to the incumbent, SJD&B, Inc., under Contract FA461020D0003, Task Order FA461024F0146. This task order will address project number/title XUMU18-1087B, Renovate/Upgrade Restroom and Sewer Drainage Lines, Facility No. 11070. The necessary repairs stem from extensive water leakage from the roof and downspouts above the restroom areas, which has caused significant damage to the gypsum board, insulation, wallpaper, and carpeting. This unforeseen damage has also led to mold development, which requires mitigation.
This project falls under the Simplified Acquisition of Base Engineering Requirements (SABER) Multiple-Award IDIQ contract. The SABER contract includes all management, supervision, labor, materials, equipment, and incidentals necessary for a broad range of maintenance, repair, and minor construction work on various real property facilities. This also includes design and engineering services incidental to construction. The SABER contract encompasses multiple trades, including but not limited to carpentry, plumbing, electrical, mechanical, painting, pipe fitting, sheet metal, welding, roofing, site work, site utilities, excavation, concrete, masonry, pavement repair, asbestos abatement, lead paint removal, security hardware installation, and demolition. This task order involves mitigating mold and moisture damage to wallpaper, drywall, insulation, and carpet in the restrooms and adjacent stairwell areas.
Scope of Work / General Description of the Project:
Don't have an account? Sign Up
Forgot password?