Cloudburst Bridgeport Bridge Replacement, Humboldt-Toiyabe National Park. The work will consist of supply and construction of a sixteen’ x 50’ prefabricated bridge superstructure with concrete grade beam foundations. The existing bridge superstructure shall be removed, and the top of the concrete abutments shall be cut and removed. The remainder of the abutments will be left in place, and the new bridge will over-span the existing abutment walls in the same location. Both approach roads will be built up to accommodate the over-span. All work shall be executed IAW, SOW, SPECS, Drawings and all attachments.
Don't have an account? Sign Up
Forgot password?